Four Seasons Staff Housing, Dubai, SAE

  • Typ budovy:
  • Bytové domy
Celá obrazovka Zavřít Street View

Built in the heart of an active industrial area of Dubai, the Four Seasons Staff Housing project is a distinguishable building among the surrounding environment. The design’s original time and cost estimates were met by using Peikko's DELTABEAM® solution. 

 Consisting of two parallel buildings with a central connection, the H-shaped structure stands out with floor-to-floor windows built within concrete blocks. The original design featured cast-in-place concrete columns and cast-in-place post-tensioned slabs with external concrete block walls.

The design consists of precast insulated cladding panels, internal precast frames and walls, and Hollow Core Slabs with the following key features:
• Continuous insulation with no thermal breaks
• Flat slabs at cantilevers and corridors
• Fast construction
• Reduced internal finishes

In 2014, the project received Honorable Mention under the Multifamily Housing category at the prestigious PCI Awards. 

www.econstruct.ae

Přečtěte si více down-arrow.png

Fakta o projektu

Velikost projektu:
21000 m2
Podlahy:
5
Developer:
Bright Start LLC
Stavební firma:
Dubai Contracting Company
Prefa závod:
e.construct
Rok dodání:
2014
Rok dokončení:
2014