The deliveries compriseds of FATBAR® rock anchors, tower adapter plates with tower flange connection bolts, drilling templates- and assembling system, special reinforcement steel technology. Peikko are also responsible for the foundation design and structural calculations. Deliveries scheduled to take place between April – August 2018.
The project development of the wind farm is carried out by Scanergy AS, and the realization of the project will be done in cooperation with the investor, a Swiss utility known as BKW Energie AG. Local project management during the construction phase will be handled by Proxima Scandinavia AS, a joint venture established between BKW Energie AB and Norwegian company Captiva Asset Management AS.
The heavy machinery contractor Bergquist Maskin og Transport AS, is responsible of the civil earthworks and infrastructure. Their subcontractor Askim Entreprenør AS, will carry out the technical assembly of steel components and casting works of the Peikko Rock Anchored Foundations. Vestas to deliver 15 of their V136-3.6MW turbines, with a hub height of 142 meters. The wind park schedueld to be opreational by the end of 2018.